AMOG was a joint finalist with State Water Corporation and Geotechnical Engineering in the Sydney Engineering Excellence Award for work on the Burrendong Dam Temperature Control Structure. The installation of a temperature control structure at Burrendong Dam in Central West NSW is set to benefit communities along the Macquarie River and improve river health by enabling warmer water from the surface of the dam to be released downstream instead of cold water from the bottom of the dam. AMOG went on to be a joint winner in one of these categories.