For use at a Coal Terminal in South East Asia, AMOG undertook a shaft redesign for a bucket wheel excavator.
The scope of work included:
- Redesign of an element of the BWE shaft that was periodically failing, allowing material ingress and binding
- Structural modelling of a revised shaft configuration
- Design drafting of a revised shaft