AMOG provided flexible riser engineering analysis support, including provision of a full time offshore representative, for the flexible riser installation of an FSO Project in the a field development project in Malaysia.
First Oil was received within a few days of completion of the installation and hydrotesting of the installed risers. AMOG analysed each step of the riser installation process and provided installation lay tables with tolerances. The riser system included a MWA (Mid Water Arch) from an external turret extending down to a subsea tie-in.