AMOG recently surveyed# 31% of the FPSO Fleet (55 vessels) and identified 7 multiple line failure events, 35 single line failure events and 32 pre-emptive replacement events. About 1/3 of events resulted in production shutdown with one shut down incurring costs of over $US1 Billion.